While many companies look to North Carolina warehousing for its ideal mid-Atlantic location, recent enhancements to the state’s rail infrastructure have only sweetened the deal. You can take advantage of these new rail connections by partnering with a 3PL provider that operates warehouses with rail siding. Such a partnership makes the process of incorporating rail into your supply chain mix even quicker and more efficient.
Rail siding is a low-speed section of railroad track that’s set apart from the traditional tracks (i.e., a main line or branch line). It connects to a through track, or to other sidings at either end of the main line. These sections of track are typically made with lighter rails and designed to handle less traffic, lower speeds, and few (if any) signals.
In most cases, rail sidings are used for marshaling, stabling, storing, loading, and unloading vehicles. At a warehouse with rail sidings, your 3PL provider can use the sidings to bring freight right up to the warehouse to be loaded or unloaded.
Coming online in October 2021, Carolina Connector from CSX is an intermodal rail terminal that sits on 330 acres in Rocky Mount, NC, a burgeoning manufacturing and logistics hub located in the Eastern part of the state. The terminal enables rail containers to be offloaded from freight cars arriving at the terminal and then loaded onto another train or truck for final distribution. The rail terminal offers direct connections to major Midwest hubs like Chicago and St. Louis.
The intermodal site can currently handle 1,250,000 containers a year. However, as the original 330-acre site has been built with the ability to expand to over 700 acres, the operation can grow relatively quickly to handle 2,500,000 containers a year.
According to the Rocky Mount Telegram, CSX is touting the Wilmington-Rocky Mount Express as the “fastest ship-to-rail service on the East Coast.” It enables cargo to reach the Midwest in five to seven days.
The CSX Connector’s capabilities have been boosted further by the recent addition of the Wilmington-Rocky Mount Express. The Express is a 140-mile rail line that extends from the Port of Wilmington to the CSX Connector terminal in Rocky Mount, enabling shippers to quickly move shipments to/from the Port via cost-effective rail.
Having a warehouse with rail siding presents numerous benefits and allows you to develop a more flexible transportation process for your supply chain. It can also help you:
At Kanban Logistics in Eastern North Carolina, we have both rail siding and a transload yard at our Rocky Mount facility, which is part of our local network of warehouses totaling over 1.5 million square feet of space. This Rocky Mount facility is served by CSX rail and can support your movements into and out of the new CSX intermodal terminal. In fact, Kanban is recognized as a premier provider in CSX’s TransFLO program, which transloads commodities between rail cars and trucks in the Eastern U.S. and Canada.
Kanban’s capabilities include the following.
To learn more about Kanban’s ability to support your rail movements on the East Coast, contact us today.